REDWOOD CITY AREA

California Highway Patrol



FACILITY LOCATION
355 CONVENTION WAY, Redwood City, 94603

FACILITY AT A GLANCE
CALENDAR YEAR 2018
667.25
Thousand kBtu
Total Grid Energy Usage
48.43
Location Efficiency Score
281.1
Thousand Gallons
Total Water Usage
6.56
Thousand sqft
Total Floor Space
Energy Use Intensity for 2018
227.2
kBtu/ft2
Source
101.7
kBtu/ft2
Site